This means that the dismantling and loading costs are mandatory. This is because these costs are part of the general project costs. Therefore, they are incurred regardless of the hammer price and the type of collection. This means that they are also estimated for self-collectors. This is because if, for example, the loading and load securing is done by the customer, preceding work phases have been carried out, such as disassembly and packaging.